Yesterday, reporter from head steel group understands, head pasture of steel Cao the wife of a prince is new " " -- head project of main body of project of Tang Gang ironworks finishs steel capital basically, one pace project enters first phase put into production plans stage, it is surely before on October 18 put into production, at present remit to the put into production inside year.
2007 the new home of pasture of Cao the wife of a prince of start working is a steel remove in Beijing area the grand opera of steely production after adjusting, the meeting after building becomes the throughout the country's biggest steely base. Press schedule, by 2008, the steel here is produced can will achieve 4.85 million tons, will achieve 9.7 million tons 2010.
Head new home of pasture of steel Cao the wife of a prince is basic and finishin
来源:
作者:Stand originally
时间:2009-01-03
Tag:
点击:
最新评论共有 0 位网友发表了评论
查看所有评论
发表评论
热点关注
- Furnace of hot-rolling o
- Company of Russia north
- Look forward to all deni
- Branch of treasure steel
- Head steel is held " 3 a
- Saddle steel head win ab
- Buy Italian enterprise s
- Head steel says profit a
- Head new home of pasture
- Pan Changgang rolling mi
- Project of energy-saving
- Wine steel is able to be
- The rolled steel gross t
- This steel most dynamoel
- "Dance steel " the card
- Steelworks of approach s
- Chinese GDP or drop to C
- Indonesian will carry ou
- Heibei iron and steel: A
- Heibei iron and steel is